How Long Does Roof Replacement Take? Often one working day. The deck under your shingles and the Wiregrass weather decide the rest.
On many Dothan homes, the old roof comes off and the new one is on before supper. Here is what stretches that to two or three days, month by month.
- 6,000+roofs since 1991
- 4.9★from 100+ Google reviews
- #30154Alabama HBLB license

- Mon13
- Tue14Day 1Tear-off, dry-in, shingles
- Wed15Day 2Ridge, cleanup, walk-through
- Thu16Spare day if it rains
- Fri17
- Sat18
- Sun19
Roof replacement, Wiregrass edition
How long does roof replacement take in Dothan, AL? For an asphalt shingle house, usually one to three working days, and many MAC homes are done in one. Rotted decking, extra layers, a steep pitch and summer storms add time. MAC Construction, Alabama license #30154, quotes the days in writing. Call +1 334-726-6401.
- 1 daymany MAC re-roofs, tear-off to cleanup
- 13.8July days with measurable rain in Dothan (NOAA)
- + a few hours to 1 dayfor rotted decking, per GAF
From yes to Day 1
How Long Does Roof Replacement Take Before the Crew Arrives?
The roof day is the short part. Ask how long does roof replacement take from the first call, and most of the answer is lead-up you can check off below.
- Free inspection with dated photos
Stephen or Sam counts the layers and probes for soft decking. You see every photo.
- Written quote with a day count
One price, the material, the tear-off plan and the days we expect.
- Permit, where the job needs one
Inside Dothan city limits, the City permit comes before tear-off.
- Material ordered
Shingles, underlayment, flashing and vents. Made-to-order metal takes longer.
- A date, and a backup date
If a wet front is coming, we move the start with you.
The inspection and photos are free. A formal written roof condition report is a separate paid service; ask for the price when you book.
Ask for a free inspection and a written day count
Form loading. Rather talk? +1 334-726-6401
One real Dothan job
Tear-Off to Ridge Cap: One Dothan Roof in Six Frames
Six photos of one MAC Construction replacement in Dothan, Alabama, in order: a real answer to how long does roof replacement take, frame by frame. Tap to enlarge.
Why the Deck Is Never Left Open
Frames 2 to 4 show the rhythm: strip a section, check the wood, dry it in. Only one section is ever open.
Where the Hours Go
GAF says tear-off to the decking typically takes a few hours. Shingles and ridge fill most of the rest.
How Long Does Roof Replacement Take on This Kind of House?
A single-story house like this is the classic one-day job. Two stories or a cut-up roof add hours.
Interactive planner
Roof Day Planner: How Long Does Roof Replacement Take on Your House?
Set your roof and the month. The planner draws a typical schedule from GAF and IKO ranges, our job notes and NOAA's Dothan rain days. A sketch, not a promise.
Layers to tear off
Pitch
Decking
Material
Typical schedule
1 working dayTear-off, dry-in, shingles and cleanup fit in one day.
- Tear-off
- Deck repair
- Dry-in
- New roof
- Cleanup
- Spare day
October: Dothan averages 7.0 days with measurable rain, about 23% of days.
Mild highs near 81°F; no special temperature steps expected.
Typical ranges only. How long does roof replacement take on your roof exactly? The free inspection sets that number.
The delay ledger
What Adds Time to a Roof Replacement in Dothan, AL
Delays come from three places: what is under the shingles, the shape of the roof and the weather. Only the weather stays a surprise.
| What turns up | Typical effect | Source | Known before Day 1? |
|---|---|---|---|
| Rotted or soft decking | A few hours to an extra day | GAF | Partly |
| A second or third layer | Often about half a day more | Our job notes | Yes |
| Pitch over 8/12 | Slower pace, safety gear | GAF | Yes |
| Many valleys, dormers and pipes | More cutting and flashing | GAF | Yes |
| Poor attic ventilation | Time to add vents | GAF | Yes |
| Tight access, fences, landscaping | Setup hours up front | GAF | Yes |
| Afternoon storm | Dry in, return next dry day | GAF | Forecast only |
| Frost or a cold snap | Later start, hand-sealing | GAF bulletin R-133 | Forecast only |
| Made-to-order metal panels | Days to weeks before Day 1 | AB Martin, Western States | Yes |


How Long Does Roof Replacement Take When the Decking Is Rotten?
Nobody sees the whole deck until the shingles are off. Soft sheets are photographed, shown to you and replaced at the per-sheet price on your quote. Bernice Anne's review below lists repairs and a chimney removal inside one roof day.
Two Layers Mean Twice the Tear-Off
Dothan enforces the 2021 International Residential Code, and R908.3.1.1 bars new shingles over two existing layers or a wet, rotted roof. Everything comes off, and the extra weight takes time to haul. See our building code guide.
So how long does roof replacement take with a second layer? Often about half a day more on an average house.
The Wiregrass calendar
How Long Does Roof Replacement Take in Alabama's Rainy Summer?
Dothan gets about 54 inches of rain a year, and not evenly. NOAA's 1991-2020 normals for Dothan Regional Airport show how long does roof replacement take to fit around the weather, month by month.
| Month | Rain days | Avg high / low | Roof-day note |
|---|---|---|---|
| January | 10.5 | 62° / 40°F | Frost may delay start |
| February | 9.9 | 66° / 43°F | Frost may delay start |
| March | 8.8 | 73° / 49°F | Good roofing weeks |
| April | 7.4 | 79° / 55°F | Driest stretch |
| May | 7.9 | 87° / 64°F | Good roofing weeks |
| June | 12.8 | 91° / 71°F | Early starts, spare day |
| July | 13.8 | 93° / 73°F | Early starts, spare day |
| August | 13.4 | 92° / 72°F | Early starts, spare day |
| September | 8.4 | 88° / 67°F | Good roofing weeks |
| October | 7.0 | 81° / 57°F | Driest stretch |
| November | 8.4 | 71° / 47°F | Good roofing weeks |
| December | 10.7 | 64° / 42°F | Frost may delay start |

Summer: Start Early, Keep a Spare Day
July averages 13.8 rain days and highs above 93°F. Malarkey advises working hot days in the morning, so crews start early and dry in before afternoon storms. How long does roof replacement take in July, then? The same crew days, plus a spare.
Winter: Shingles That Wait for Sun
January lows average under 40°F. GAF says shingles handle best above 40°F and may need hand-sealing in the cold. Frost can delay the start; otherwise, how long does roof replacement take in winter is about the same.
Sources: NOAA U.S. Climate Normals 1991-2020, GAF temperature bulletin, Malarkey cold-weather bulletin and GAF shingle instructions (dry deck rule).
Shingles or metal
Shingle vs Metal: What the Big Guides Say About Install Days
National guides agree on shingles and disagree on metal. Here is how long does roof replacement take by their numbers, on one 14-day scale.
| Roof type | Who says | Published range | Range bar1714 days |
|---|---|---|---|
| Asphalt shingles | GAF blog (2024) | 1 to 2 days, average-size home | |
| Asphalt shingles | IKO (2026 update) | A day or two, start to finish | |
| Asphalt shingles | Angi (Jul 2026) | 1 to 3 days | |
| Steel sheets | Roofr | 3 to 4 days | |
| Metal, all types | Angi (Jul 2026) | 7 to 14 days |
How Long Does Roof Replacement Take With Architectural Shingles?
Architectural shingles from TAMKO, CertainTeed, GAF, Owens Corning and Malarkey are most of our work. See our architectural shingle page.


Why Metal Takes Longer, Before and On the Roof
Panels and trim are fitted piece by piece, and standing seam is made to length. AB Martin lists its panels as usually ready 2 to 3 days after an order; Western States Metal Roofing quotes two to three weeks.
We install 3-ft screw-down panels and snap-lock standing seam; see our metal roofing page.
Panel lead times: AB Martin ABSeam panel and Western States Metal Roofing.
Real customers, real clocks
One Day, a Day and a Half, Two and a Half: What Customers Timed
Rated 4.9★ from 100+ Google reviews. Three customers, quoted word for word, answer how long does roof replacement take. We don't say where reviewers live.
- 1 day
Google review · ★★★★★5 out of 5 stars
"Stephen McDuffie and the crew of MAC CONSTRUCTION got my roof done in one day. Tore off old roof. Did repairs. Removed the old turbines and chimney. … Very responsible priced. I recommend MAC CONSTRUCTION."
Bernice Anne1 day on the roof - 1½ days
Google review · ★★★★★5 out of 5 stars
"I had a roof replacement done. I think they did a great job. …finished in 1 and 1/2 days. So far everything is great. As of today I would recommend them highly."
Grimm Crowley1½ days on the roof - 2½ days
Google review · ★★★★★5 out of 5 stars
"Excellent communication throughout the contracting and installation phases. They were on time and very professional with onsite project management. They completed a complex roof in 2.5 days and it looks great. Exceptional clean up as well. I highly recommend them as a roofing contractor!"
Bill Roberts2½ days on the roof
Real experience, real projects
What 6,000+ Roof Days Actually Teach You About Timing
Stephen McDuffie started roofing in 1985 and founded MAC Construction in August 1991. His son Sam works beside him full-time, and the team of 15 has put on 6,000+ roofs.
The lesson is simple: when someone asks how long does roof replacement take, the honest answer starts with a plan. Layers counted, decking probed and material on site make one-day jobs possible.

We are not claiming to be the fastest or best roofer in Dothan. The video shows Stephen and Sam McDuffie during a real MAC Construction roof replacement.
Stephen, in his words: "A great roofer will not cut corners to get a job."
Watch: Real MAC Construction Project Video
Rules that move the start date
Permits, Licenses and Claims: The Paper Side of the Timeline
Paperwork rarely changes how long does roof replacement take on the roof itself. It changes when the crew can start.
City of Dothan
Permit First, Tear-Off Second
Dothan requires permits for alterations under Section 14-5, issued to the owner or a City-licensed contractor, online or at the Civic Center weekdays 8:00 to 4:00. Outside city limits, the county or town decides.
City permit requirements · City permit FAQ · (334) 615-4450
State of Alabama
Licensed Roofer Over $2,500
Residential roofing over $2,500 needs a Home Builders Licensure Board license. Ours is #30154; check any roofer at hblb.alabama.gov or see our license lookup guide.
Insurance claims
Your Claim, Your Pace
Under Ala. Code §8-36-2 a residential roofer cannot negotiate with your insurer for you. We give you dated photos and a written scope. See the Alabama Department of Insurance warning and our claim guide.
Questions
Roof Replacement Timing Questions from Dothan Homeowners
Many of the homes we re-roof in Dothan are finished in one working day, tear-off to cleanup. Larger, steeper or layered roofs usually need two or three days, and the written quote lists the days we plan.
Yes, on many single-story shingle homes. The crew strips and dries in one slope at a time, so the house is never left open overnight. So how long does roof replacement take on a two-story house? Often into a second day.
Work stops, because GAF and other makers require a dry deck before shingles go on. The crew covers the open section and returns on the next dry day, so most rain delays cost a day, not a week.
October and April are the driest months in NOAA's 1991-2020 normals for Dothan Regional Airport, with about 7 rain days each. June through August average 13 to 14, so summer jobs start early and keep a spare day.
GAF puts it at a few hours to an extra day, depending on how many sheets are soft. We photograph bad decking first, and the per-sheet price is on your quote.
Plan on extra tear-off time. Dothan's 2021 building code does not allow new shingles over two existing layers, so both come off down to the deck.
Usually. Published guides range from 3 to 4 days for steel sheets to 7 to 14 days for metal in general, and standing seam panels are made to order before Day 1. So how long does roof replacement take with metal? Plan on more days than shingles.
Inside city limits, plan on one; the City waives permits only for minor, non-structural repairs under $1,000. Outside city limits the county or town decides, and (334) 615-4450 can tell you which applies.
It can, because work usually waits until you and your insurer settle the scope. Alabama law bars a roofer from negotiating your claim, so we give you dated photos and a written scope to send. How long does roof replacement take once the claim is settled? The same roof days as any other job.
Next steps
Planning a New Roof Somewhere in the Wiregrass
Crews leave West County Road 70 for Dothan, Headland, Ozark and Enterprise. How long does roof replacement take out of town? The same roof days; the drive is planned in.
Related roofing guides and services
Your roof day?
Free inspection, written day count
Circle a Date. We'll Tell You How Many Days It Takes.
Want to know how long does roof replacement take on your own Dothan, AL house? Send the form and Stephen or Sam will set a time to look.
- 1We inspect the roof and take dated photos, free.
- 2You get a written quote with the price and the planned days.
- 3You pick the date, with a backup. Replacements carry a 5-year written workmanship warranty.